Friends links
|
|
| Picture |
Heading |
Updated |
 |
Drilling Cuttings Drying System
Description In order to maximally recover the valuable drilling fluids and reduce the volume of waste discharge, the drilling contractors always adopt drilling waste management equipment to further treat the discharged waste cuttings from primary solids c |
2017-09-11 |
 |
250kg/hr Oil Sludge Incinerator With Gas Disposal
Technical Data Attach: operating costs 1.Gross capacity: 18 kw air blower:5.5 Kw * 1 (operation continuous) #9; exhaust fan:7.5 Kw * 1 (operation continuous) primary burner:0.32 Kw * 1 (operation intermittent) Secondary burner:0.32 Kw * 1 (operation conti |
2017-08-06 |
 |
HBW450/5 Horizontal,triplex-cylinder,reciprocating Single-acting Plunger Pump
Technical Data |
2017-07-17 |
 |
Waste Tire Solution
First Step Tire Prolysis Plant Second Step From Black Oil to Golden Diesel Oil Third Step Chemical Oil Refinery |
2017-07-08 |
|